Draft Certification of Consistency for the Delta Conveyance Project

The California Department of Water Resources intends to submit to the Delta Stewardship Council a Certification of Consistency for the Delta Conveyance Project. Consistent with the Delta Stewardship Council requirements, DWR is posting a draft of the certification at least 10-days prior to formal submission for public review and comment. Please send all comments to DCP_Consistency@water.ca.gov by October 13, 2025.

Public Draft Form for the Delta Conveyance Project Certification of Consistency

Public Draft Delta Conveyance Project Certification of Consistency with the Delta Plan

Attachment A: Delta Plan Recommendations WR R12a and WR R12b Crosswalk Table

RR P3 Attachment 1: Conveyance Facilities in Relation to Regulated Floodways and Streams

RR P3 Attachment 2: Initial Mitigation Sites in Relation to Regulated Floodways and Streams

RR P4 Attachment 1: Conveyance Facilities in Relation to Floodplain Protection

RR P4 Attachment 2: Initial Mitigation Sites in Relation to Floodplain Protection

WR P1 Attachment 1: Supplemental Technical Memorandum: Results of Data Compilation and Analysis for Demonstrating Contributions to Reduced Reliance on the Delta and Improved Regional Self-Reliance

WR P1 Attachment 2: Project Need and Historical Background

WR P2 Attachment 1: Public Participation and Outreach Materials for the Agreement in Principle for the State Water Project Water Supply Contract Amendment on a Delta Conveyance Project

ER PA Attachment 1: Delta Plan Appendix 3A

ER P1 Attachment 1: Delta Flow Data Tables

ER P2 Attachment 1: Delta Plan Appendix 4A

ER P2 Attachment 2: Initial Mitigation Sites Ecosystem Restoration in Relation to Elevation Bands

ER P3 Attachment 1: Conveyance Facilities in Relation to Priority Habitat Restoration Areas

ER P3 Attachment 2: Initial Mitigation Sites in Relation to Priority Habitat Restoration Areas

DP P2 Attachment 1: Existing Land Uses Conflicts Analysis

DP P2 Attachment 2: Evaluation of Operation Effects Relevant to Delta Plan Policy DP P2 on Existing Land Uses

G P1(b)(2) Attachment 1: Delta Plan and Delta Conveyance Project Mitigation Crosswalk Table

G P1(b)(3) Attachment 1: Delta Conveyance Project Best Available Science Consistency Analysis

G P1(b)(4) Attachment 1: North Delta Diversion Operations Adaptive Management and Monitoring Plan

G P1(b)(4) Attachment 2: Compensatory Mitigation Plan Adaptive Management Plan

G P1(b)(4) Attachment 3: Habitat Connectivity Adaptive Management Plan

G P1(b)(4) Attachment 4: Groundwater Monitoring Adaptive Management Plan

G P1(b)(4) Attachment 5: Sediment Monitoring, Modeling, and Reintroduction Adaptive Management Plan