Final Certification of Consistency for the Delta Conveyance Project
DWR submitted a Certification of Consistency with the Delta Plan for the Delta Conveyance Project on October 17, 2025.
According to the DSC regulations, materials relevant to this Certification will be posted on their website (https://coveredactions.deltacouncil.ca.gov), if the Certification is appealed, an appeal hearing will be held followed by the issuance of a determination on the appeal.
Transmittal Letter from DWR Director Nemeth
Final Draft Form for the Delta Conveyance Project Certification of Consistency
Final Draft Delta Conveyance Project Certification of Consistency with the Delta Plan
Attachment A: Delta Plan Recommendations WR R12a and WR R12b Crosswalk Table
RR P3 Attachment 1: Conveyance Facilities in Relation to Regulated Floodways and Streams
RR P3 Attachment 2: Initial Mitigation Sites in Relation to Regulated Floodways and Streams
RR P4 Attachment 1: Conveyance Facilities in Relation to Floodplain Protection
RR P4 Attachment 2: Initial Mitigation Sites in Relation to Floodplain Protection
WR P1 Attachment 2: Project Need and Historical Background
ER PA Attachment 1: Delta Plan Appendix 3A
ER P1 Attachment 1: Delta Flow Data Tables
ER P2 Attachment 1: Delta Plan Appendix 4A
ER P2 Attachment 2: Initial Mitigation Sites Ecosystem Restoration in Relation to Elevation Bands
ER P3 Attachment 1: Conveyance Facilities in Relation to Priority Habitat Restoration Areas
ER P3 Attachment 2: Initial Mitigation Sites in Relation to Priority Habitat Restoration Areas
DP P2 Attachment 1: Existing Land Uses Conflicts Analysis
G P1(b)(2) Attachment 1: Delta Plan and Delta Conveyance Project Mitigation Crosswalk Table
G P1(b)(3) Attachment 1: Delta Conveyance Project Best Available Science Consistency Analysis
G P1(b)(4) Attachment 1: North Delta Diversion Operations Adaptive Management and Monitoring Plan
G P1(b)(4) Attachment 2: Compensatory Mitigation Plan Adaptive Management Plan
G P1(b)(4) Attachment 3: Habitat Connectivity Adaptive Management Plan
G P1(b)(4) Attachment 4: Groundwater Monitoring Adaptive Management Plan
G P1(b)(4) Attachment 5: Sediment Monitoring, Modeling, and Reintroduction Adaptive Management Plan